Page 32 - 2022 CPC Corporation,Taiwan
P. 32
Industrial safety & health Continuing improvement to increase safety effectiveness CPC's occupational accident statistics for the past five years Frequency of Disabling Injury In 2021, CPC has investigated and analyzed all workplace incidents and accidents to find the root cause, 0.20 drawn up action plans, improvement plans and scheduled 0.18 follow-ups. The action plans and improvement plans are as 0.18 follows: Action plans 0.02 • E-management: CPC has introduced the use of digital 0.00 platforms, which allows construction workers to provide work permits and allow inspectors to confirm the tasks by computer, mobile phone or tablet, in order to work efficiently and safety. • Enhancement of training for contractors: we have enhanced safety and technical training for contractors on high-risk operations, including three-in-one scaffold safety training, equipment dismantling training, and aerial work platform safety training. Only qualified contractors who have completed the training can start their work in CPC. 140 2017 2018 2019 2020 2021 Severity of Disabling Injury 178 Improvement plans 120 100 • Enhancement of training for contractor supervisors: 80 CPC provides training to contract supervisors in 60 northern, central and southern of Taiwan, and improves 40 their professional knowledge and capabilities about 20 recognizing hazards and risks. 0 • Procurement control: CPC has strengthened its review of job description documents for procurement activities to contractors, urging contractors to conduct self- management. 15 010 2017 2018 2019 2020 2021 Occupational Injury Frequency-Severity Index • Utilization of AI technology: CPC has utilized technology tools to improve its contractor management performance. For example, CPC has integrated its access control measures for its contractors, carried out inspections for operational safety purposes, and installed a CCTV system 3.50 to continuously supervise at-risk behaviors or site safety. 2.50 2.00 1.50 1.00 0.50 0.00 0.16 0.14 0.12 0.10 0.11 0.08 • Implementing PSM in CPC: There were five key facilities establishing PSM in Linyuan, Dalin, Taoyan, Yongan and 0.08 Taichung separately as the first step. The next step is to 0.06 carry out all-round implementation to all manufacturing 0.04 units in CPC. 0.08 0.08 200 180 160 4.00 3.00 3.77 1.64 0.00 0.00 2017 2018 2019 2020 2021 0.33